Home > Coastal and floodplains > Estuaries > Major Estuaries
Estuaries in NSW
Georges River
|
|
|
| Next South | Next North |
| Botany Bay | Cooks River |
|
|
|
|
|
Georges River |
|
|
|
Estuary Characteristics
| Area Catchment | 800 km2 |
| Waterway Area | 12 km2 |
| Entrance Characteristics | Open to Botany Bay |
| Location (Lat-Long) | 33.998S , 151.155E |
| Distance (from Sydney) | 30 km South |
| Summary of Available Data | Data Pages |
Physical Features
The river varies in width from about 30 m near Liverpool to approximately 1,500 m at its mouth adjacent to Dolls Point in Botany Bay. The tidal limit is at Liverpool Weir, approximately 50 km upstream of Dolls Point where the tidal range is approximately equal to that at the mouth.
Significant Estuarine Tributaries
Georges River
Prospect Creek
Lake Gillawarna
Williams Creek
Tudera Creek
Yeramba Lagoon
Salt Pan Creek
Little Salt Pan Creek
Boggywell Creek
Woronora River
Forbes Creek
Woronora River
Population and Holiday Centres
Liverpool and Sydney Southwestern Suburbs
Special Attributes
General
- Liverpool weir building by convicts in 1836 under the supervision of Lennox.
- Important recreational waterway for residents of the south-western suburbs of Sydney - very popular amateur fishing and motor boating.
- The Chipping Norton Lake Scheme, situated near the tidal limit, involves rehabilitation of some 160 ha of sand and gravel pits to provide a water-based recreational amenity, and substantially enhanced estuarine environment.
- Heavy urban pollution inputs, ie. sewage, sediment and nutrients.
- Source of extractive sand resources.
Estuarine Vegetation
The spatial data is reproduced from NSW Fisheries(2006/7) studies, whilst the species makeup is from the West et al.(1985). This map shows the spatial extent of the Estuarine Vegetation.
| Type | Area | Species 1 |
|---|---|---|
| (km2) | ||
| Mangroves | 2.115 | av,ae |
| Seagrass | 0.481 | z |
| Saltmarsh | 0.276 |
References
R.J. Williams, G. West, D. Morrison and R.G. Creese, (2006),
"Estuarine Resources of New South Wales",
prepared for the Comprehensive Coastal Assessment (DoP) by the NSW Department of
Primary Industries, Port Stephens.
R.J. West, C.A. Thorogood, T.R. Walford and R.J. Williams. (1985).
"An Estuarine Inventory for New South Wales, Australia".
Fisheries Bulletin 2. Department of Agriculture, New South Wales.
Estuary Commerce
oyster, boating, tourism, extraction
Management Issues
This estuary falls in the area covered by Sydney Metro Catchment Management Authority.
There are 5 committee(s) active on this estuary
Georges River
Management Issues
- Contaminants in bottom sediments have resulted in commercial and recreational fishing bans in the lower reaches.
- Water quality is influenced by stormwater, land use, recreational and commercial shipping discharges.
- Woronora Dam, removal of upland swamps, groundwater extractions and past dredging have modified the volume and pattern of river flows.
The Estuary Management Process 2
| Process | Status | Date |
|---|---|---|
| Form Estuary Management Committee (EMC) | none | |
| Assemble Existing Data | none | |
| Carryout Process Study | none | |
| Carryout Estuary Management Study | none | |
| Draft Estuary Management Plan | none | |
| Review Estuary Management Plan | none | |
| Implement Estuary Management Plan | none | |
| Monitor and Review Estuary Management Process | none |
Contact Details
Little Salt Pan Creek
Current Situation
Bankstown Council has formed an estuary management committee for Little Salt Pan Creek. An estuary management plan has been prepared which Council is currently implementing.
The Estuary Management Process 2
| Process | Status | Date |
|---|---|---|
| Form Estuary Management Committee (EMC) | completed | |
| Assemble Existing Data | completed | |
| Carryout Process Study | completed | |
| Carryout Estuary Management Study | completed | |
| Draft Estuary Management Plan | completed | |
| Review Estuary Management Plan | completed | |
| Implement Estuary Management Plan | commenced | |
| Monitor and Review Estuary Management Process | none |
Contact Details
| Bankstown City Council | Nerida Williams |
| Ph (02) 9707 9400 Fax 9707 9587 |
Kelso Creek
Current Situation
Bankstown Council has formed an estuary management committee for Kelso Creek. An estuary management plan has been prepared which Council is currently implementing.
The Estuary Management Process 2
| Process | Status | Date |
|---|---|---|
| Form Estuary Management Committee (EMC) | completed | |
| Assemble Existing Data | completed | |
| Carryout Process Study | completed | |
| Carryout Estuary Management Study | completed | |
| Draft Estuary Management Plan | completed | |
| Review Estuary Management Plan | completed | |
| Implement Estuary Management Plan | commenced | |
| Monitor and Review Estuary Management Process | none |
Contact Details
| Bankstown City Council | Nerida Williams |
| Ph (02) 9707 9400 Fax 9707 9587 |
Kogarah Bay and Oatley Bay
Current Situation
Kogarah Council has formed an estuary management committee for its waterways within the Georges River including Kogarah Bay and Oatley Bay. Council is currently preparing a process and management options study for Kogarah Bay as a step in the preparation of the management plan for the bay.
The Estuary Management Process 2
| Process | Status | Date |
|---|---|---|
| Form Estuary Management Committee (EMC) | completed | |
| Assemble Existing Data | completed | |
| Carryout Process Study | commenced | |
| Carryout Estuary Management Study | commenced | |
| Draft Estuary Management Plan | none | |
| Review Estuary Management Plan | none | |
| Implement Estuary Management Plan | none | |
| Monitor and Review Estuary Management Process | none |
Contact Details
| Kogarah Council | Amit Chanan |
| Ph (02) 9330 9400 Fax 9330 9560 |
Woronora River
Current Situation
Sutherland Shire Council has formed an estuary management committee for the Woronora River Estuary to prepare an estuary management plan. The main issues to be focused on include the silting up of the river, access problems by residents of Deepwater Estate, bank erosion, water quality, and protection of Aboriginal cultural heritage.
The Estuary Management Process 2
| Process | Status | Date |
|---|---|---|
| Form Estuary Management Committee (EMC) | completed | |
| Assemble Existing Data | completed | |
| Carryout Process Study | commenced | |
| Carryout Estuary Management Study | none | |
| Draft Estuary Management Plan | none | |
| Review Estuary Management Plan | none | |
| Implement Estuary Management Plan | none | |
| Monitor and Review Estuary Management Process | none |
Contact Details
| Sutherland Shire Council | Gwyn Cleeves |
| Ph (02) 9710 0473 |
References
Local Government Areas
Sutherland
Bankstown
Hurstville
Rockdale
Kogarah
Liverpool
NSW 1:25000 Map Name(s)
Botany Bay
Liverpool
Port Hacking
